Projects

Oil Storage Terminal Projects: Delivered, Planned and Proven

Since 2018, we have delivered 34 infrastructure and consulting projects in nine countries. They range from early-stage feasibility studies to live-terminal expansions that added hundreds of thousands of cubic metres of capacity. Here is a selection.

34

Projects since 2018

9

Countries

510,000 m³

Capacity added to our own network through expansions (2023–2025)

840,000 m³

Borneo masterplan capacity under planning

620,000 m³

Further expansion pipeline across our terminals

Conceptual masterplan of the proposed Borneo Oil Storage Terminal

Featured Project

A proposed deepwater storage and marine terminal to strengthen fuel supply security and logistics in East Malaysia. Asian Oil Storage has led site screening, concept development, the terminal masterplan and stakeholder proposal briefings.

Location
East Malaysia (Borneo)
Sector
New Development
Status
Planning: pre-FEED and EIA scoping
Scope
Planning, proposal briefings and preliminary infrastructure consulting
Key metrics
480,000 m³ Phase 1 · 840,000 m³ masterplan · 20 tanks · 42 ha · 1.2 km jetty trestle

Portfolio

Selected Projects

Development, expansion, modernisation, consulting and digital projects. Filter by type or region.

Completed, 2023

Expansion

Singapore Storage Expansion

Jurong, Singapore

A brownfield expansion that raised the Jurong terminal’s capacity by 55% within the existing site, without interrupting live operations. It added heated fuel oil, distillate and naphtha tankage.

Scope
Development, engineering, construction management, commissioning
Key metrics
+290,000 m³ · 5 tanks · 19 months FID to commissioning · USD 124 million
Read the Case Study
Completed, 2025

Expansion / Modernisation

Rotterdam Energy Logistics Hub

Botlek, Rotterdam, Netherlands

A programme to turn a conventional clean-products terminal into a flexible barge and biofuel blending hub.

Scope
Barge berth reconfiguration, inline biofuel blending, biofuel tankage, vapour recovery upgrade
Key metrics
2 × 30,000 m³ biofuel tanks · barge turnaround −26% · VOC emissions −38% · EUR 46 million
Read the Case Study
Completed, 2025

Expansion / Modernisation

Fujairah Marine Storage Optimisation

Port of Fujairah, UAE

Added VLSFO blending capacity and raised bunker barge loading performance at our Middle East hub.

Scope
Heated blending tanks, barge berth upgrade, heating optimisation, solar installation
Key metrics
+160,000 m³ · barge loading 1,500 → 2,200 m³/h · 1.8 MWp solar · USD 72 million
Read the Case Study
Completed, 2025

Modernisation / Digital

Houston Terminal Integration and Controls Modernisation

Houston Ship Channel, Texas, USA

Brought a newly acquired terminal up to group standards for control, safety and data without interrupting customer operations.

Scope
SCADA replacement, safety instrumented overfill protection, hurricane hardening, TMS integration
Key metrics
14 tanks upgraded · integrated in 11 months · USD 21 million
Read the Case Study
Completed, 2025

Digital

Group Terminal Management System

All four terminals and Kuala Lumpur

A single system for inventory, scheduling, movements and customer reporting across the network.

Scope
Selection, configuration and rollout of a common terminal management system; customer portal; Network Performance Centre
Key metrics
4 terminals · 60 tanks · one inventory and scheduling platform
Explore Our Technology
In progress, 2026

Digital

Jurong Digital Twin Pilot

Jurong, Singapore

Testing how a connected model of the terminal can improve maintenance planning, operator training and change management.

Scope
3D model of tank farm and jetty linked to live operating and maintenance data
Key metrics
16 tanks and 4 berths modelled · pilot evaluation due Q1 2027
Explore Our Technology
Planning: FEED

Expansion

Fujairah Phase 3 Expansion

Port of Fujairah, UAE

Scope
Two 120,000 m³ tanks for crude and fuel oil, with a connection to the VLCC berth
Key metrics
+240,000 m³ · FID target 2027
Discuss Capacity in Fujairah
Planning: permitted

Expansion

Houston Tank Expansion

Houston Ship Channel, Texas, USA

Scope
Four 40,000 m³ tanks
Key metrics
+160,000 m³ (~1.0 million bbl) · FID target 2027
Discuss Capacity in Houston
Planning: permitting

Expansion

Rotterdam Renewable Fuels Expansion

Botlek, Rotterdam, Netherlands

Scope
Four 30,000 m³ tanks for renewable diesel, SAF and components on a 3-hectare reserve plot
Key metrics
+120,000 m³
Discuss Renewable Fuels Storage
Completed, 2018

Consulting

Peninsular Malaysia Coastal Distribution Terminal: Pre-FEED

Peninsular Malaysia

Our first major development assignment. It established the engineering approach we still use today.

Scope
Pre-FEED: tank farm layout, jetty concept, utilities, Class 4 cost estimate · Client: regional fuel distributor
Key metrics
150,000 m³ design capacity · 10 tanks · 1 coastal berth
Completed, 2019

Consulting

Sumatra Coastal Fuel Depot: Feasibility Study

Sumatra, Indonesia

The study recommended a smaller first phase than the client first proposed, which reduced up-front capital by about 40%.

Scope
Demand assessment, site screening, capacity sizing, investment appraisal · Client: industrial energy group
Key metrics
4 sites evaluated · 60,000 m³ recommended first phase
Completed, 2020

Consulting

Central Vietnam Product Terminal: Concept Study

Central Vietnam

Scope
Concept options, marine access assessment, layout alternatives, phasing · Client: infrastructure developer
Key metrics
3 concept options · 200,000 m³ masterplan
Completed, 2020

Consulting

Brunei Industrial Fuel Storage Assessment

Brunei Darussalam

Scope
Condition assessment, remaining-life review and upgrade plan for existing storage · Client: industrial operator
Key metrics
9 tanks assessed · 5-year integrity investment plan
Completed, 2021

Consulting

Philippines Marine Fuel Storage Assessment

The Philippines

Scope
Market assessment, site options and preliminary engineering for a marine fuel storage facility · Client: marine fuel supplier
Key metrics
3 port locations assessed · 45,000 m³ concept

Interested in our consulting services? Every project above began with a clear framing of the business need.

How We Deliver Projects

A Consistent Delivery Approach

Each stage ends with a decision gate. Projects move forward only when the information is good enough to support the next commitment.

  1. 01

    Frame

    Define the business need, constraints and success criteria

  2. 02

    Assess

    Feasibility, site screening and options analysis

  3. 03

    Select

    Concept selection with a stated cost-estimate class and risk register

  4. 04

    Define

    Pre-FEED and FEED, permitting and procurement strategy

  5. 05

    Execute

    Construction management with safety as the first priority

  6. 06

    Operate

    Commissioning, handover and performance review

Next steps

Have a Project in Mind?

Whether you are at the idea stage or ready to build, our engineering and development team can help.